The Role of Managerial Commitment and TPM Implementation Strategies in Productivity Benefits
The present research proposes a structural equation model to integrate four latent variables: managerial commitment, preventive maintenance, total productive maintenance, and productivity benefits. In addition, these variables are related through six research hypotheses that are validated using colle...
Shranjeno v:
Glavni avtor: | |
---|---|
Drugi avtorji: | , , , , |
Format: | Artículo |
Jezik: | en_US |
Izdano: |
2018
|
Teme: | |
Online dostop: | https://doi.org/10.3390/app8071153 https://www.mdpi.com/2076-3417/8/7/1153 |
Oznake: |
Označite
Brez oznak, prvi označite!
|
Komentirajte kot prvi!