Project portfolio selection with scheduling: an evolutionary approach
This paper addresses the project portfolio selection problem enriched with scheduling. Thefactors considered for project scheduling are: the planning time horizon and the negative impact of theproject completion time on the total profit. The objective is to select a subset of projects which maximize...
保存先:
第一著者: | Martínez-Vega, Daniel |
---|---|
その他の著者: | Cruz-Reyes, Laura, Rangel V., Nelson, Gómez S., Claudia G., Sánchez Solís, Julia Patricia, Pérez V., Mercedes |
フォーマット: | Artículo |
言語: | English |
出版事項: |
2019
|
主題: | |
オンライン・アクセス: | https://www.ijcopi.org/index.php/ojs/article/view/113 |
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
類似資料
-
Interdependent Projects Selection with Preference Incorporation
著者:: Gómez, Claudia
出版事項: (2018) -
Genetic Algorithm for Scheduling Optimization Considering Heterogeneous Containers: A Real-World Case Study
著者:: Rivera Zarate, Gilberto
出版事項: (2020) -
Metaheuristic-based optimization of treated water distribution in a Mexican City
著者:: Alvarado, Osvaldo
出版事項: (2018) -
Improvement project in higher education institutions: A BPEP-based model
出版事項: (2020) -
Exact analytic solution of an unsolvable class of first Lane–Emden equation for polytropic gas sphere
著者:: torres cordoba, rafael
出版事項: (2020)